Terms of Service

Last Updated: November 27, 2026

These Terms of Service govern all services, estimates, proposals, and communications provided by Temple City Concrete Contractors, referred to herein as the company, we, us, or our, to any customer, property owner, or authorized representative, referred to herein as the customer, you, or your. By requesting an estimate, signing a proposal, scheduling work, or otherwise engaging our services in Temple City, California and surrounding areas, you acknowledge that you have read, understood, and agree to be bound by these Terms. If you do not agree, please do not engage our services. Where a separate written contract is executed for a specific project, that contract shall control in the event of any conflict with these Terms.

1. Service Description

Temple City Concrete Contractors provides residential and light commercial concrete services, which may include, without limitation, driveways, patios, walkways, sidewalks, slabs, foundations, retaining walls, steps, curbs, stamped and decorative concrete, concrete repair, removal and replacement, grading, and related site preparation. The specific scope of work, materials, dimensions, finishes, and estimated timeline for each project shall be set forth in a written estimate, proposal, or contract. Any work not expressly described in the written scope is excluded unless added by a signed change order. Estimates are based on visible site conditions at the time of inspection and are valid for thirty (30) days unless otherwise stated. The company reserves the right to subcontract portions of the work to qualified, licensed professionals. All work shall be performed in a workmanlike manner consistent with applicable California building codes and industry standards.

2. Licensing, Permits, and Regulatory Notices

The company performs work in accordance with California contractor licensing requirements. Contractors are required by law to be licensed and regulated by the Contractors State License Board, which has jurisdiction to investigate complaints against contractors. Unless otherwise agreed in writing, the responsibility for obtaining required building permits shall be specified in the project contract, and associated permit fees shall be paid by the customer. For home improvement projects, any down payment shall not exceed the amount permitted under California Business and Professions Code Section 7159, and the customer shall receive all disclosures and notices required by law, including any applicable three-day right to cancel.

3. Customer Obligations

The customer agrees to: (a) provide accurate information regarding the property, project requirements, and any known site conditions; (b) confirm that the customer owns the property or has written authority from the owner to authorize the work; (c) identify property lines, easements, and the location of private underground utilities, sprinkler lines, septic systems, and other buried improvements, as the company is not responsible for damage to unmarked private lines; (d) provide safe and unobstructed access to the work area, including clearance for trucks and equipment, and remove vehicles, furniture, plants, and personal property from the work area; (e) obtain any required homeowners association or neighbor approvals; (f) provide access to water and electricity as reasonably needed; (g) keep children, pets, and vehicles off newly placed concrete for the curing periods advised by the company; and (h) follow all care and maintenance instructions provided upon completion. Delays or additional costs resulting from the customer's failure to meet these obligations may result in schedule changes and additional charges.

4. Change Orders and Unforeseen Conditions

Any modification to the agreed scope of work, materials, or design must be documented in a written change order signed by both parties before the changed work is performed, and may adjust the contract price and schedule. If concealed or unforeseen conditions are discovered during the work, including but not limited to buried debris, rock, unsuitable or expansive soil, tree roots, existing concrete thicker than anticipated, or hidden utilities, the company will notify the customer and may require a change order before proceeding. The company shall not be obligated to perform additional work without written authorization.

5. Payment Terms

Payment terms, including any deposit and progress payment schedule, shall be specified in the written contract. Unless otherwise agreed, a deposit not exceeding the amount allowed by California law may be required to schedule the project, progress payments shall correspond to work completed or materials delivered, and the final balance is due upon substantial completion of the work. Accepted payment methods will be identified on the invoice. Balances not paid within fifteen (15) days of the due date may accrue a late charge of one and one-half percent (1.5%) per month, or the maximum rate permitted by law, whichever is less. Returned payments may incur a reasonable processing fee. The customer is advised that, under California law, contractors, subcontractors, laborers, and suppliers who are not paid may have the right to record a mechanics lien against the property. In the event collection efforts are required, the customer shall be responsible for reasonable collection costs and attorney fees to the extent permitted by law.

6. Scheduling, Weather, and Delays

Project start and completion dates are estimates. Concrete work is highly sensitive to weather, temperature, and site conditions, and the company may reschedule work due to rain, extreme heat, cold, or other conditions that could compromise quality. The company shall not be liable for delays caused by weather, material shortages, supplier delays, permit or inspection delays, labor disputes, acts of government, natural disasters, customer-caused delays, or other events beyond its reasonable control. In such cases, the schedule shall be extended for a reasonable period.

7. Cancellation Policy

Where applicable, the customer may cancel a home improvement contract within three (3) business days of signing, as provided under California law, by delivering written notice to the company, and any deposit paid will be refunded in accordance with law. After the statutory cancellation period, the customer may cancel by providing written notice to the company; however, the customer shall be responsible for the value of work performed, costs of materials ordered or delivered that cannot be returned, restocking fees, permit fees incurred, and reasonable administrative costs, which may be deducted from any deposit. Cancellations or rescheduling requests made less than forty-eight (48) hours before a scheduled concrete pour may result in charges for ordered concrete, pump services, or crew mobilization that cannot be cancelled. The company reserves the right to cancel or suspend work upon written notice if the customer fails to make required payments, fails to provide site access, or materially breaches these Terms, and the customer shall remain responsible for payment for work performed through the date of suspension or cancellation.

8. Nature of Concrete and Customer Acknowledgments

The customer acknowledges that concrete is a natural material subject to inherent characteristics. Hairline cracking, shrinkage cracks, minor surface variations, color and shade differences, efflorescence, and slight differences in texture are normal and are not considered defects. Control joints are installed to encourage cracking in planned locations but cannot prevent all cracking. Color, stain, and stamped patterns may vary from samples and between pours. The company does not guarantee that new concrete will match existing concrete in color or texture. Settlement, heaving, or cracking caused by soil movement, poor drainage, tree roots, or conditions outside the company's control are not defects in workmanship.

9. Warranties

The company warrants that its workmanship will be free from material defects for a period of one (1) year from the date of substantial completion, unless a different period is stated in the written contract. Under this warranty, the company will, at its option, repair or replace defective work. This warranty does not cover: normal hairline or shrinkage cracking; damage from heavy vehicles or loads exceeding design specifications; soil settlement, expansion, or movement; tree roots; improper drainage or irrigation; use of de-icing salts or harsh chemicals; failure to follow curing and maintenance instructions; acts of nature, earthquakes, or flooding; alterations or repairs by others; or materials supplied by the customer. Manufacturer warranties on materials, if any, are passed through to the customer. Warranty claims must be submitted in writing within the warranty period. To the fullest extent permitted by law, the express warranty stated herein is in lieu of all other warranties, express or implied, including implied warranties of merchantability and fitness for a particular purpose, except those warranties which cannot be disclaimed under California law.

10. Limitation of Liability

To the maximum extent permitted by law, the company's total liability arising out of or relating to any project or these Terms shall not exceed the total amount paid by the customer to the company for the specific project giving rise to the claim. In no event shall the company be liable for any indirect, incidental, consequential, special, or punitive damages, including loss of use, lost profits, or diminished property value. The company shall not be responsible for damage to driveways, landscaping, lawns, sprinkler systems, or underground lines that are unmarked or that result from ordinary and reasonably necessary access by equipment and delivery vehicles, except where caused by the company's negligence. Nothing in these Terms limits liability for gross negligence, willful misconduct, or any liability that cannot be limited under California law.

11. Indemnification

The customer agrees to indemnify and hold harmless the company, its owners, employees, and subcontractors from claims, damages, or expenses arising from the customer's breach of these Terms, inaccurate information provided by the customer, the customer's failure to disclose hazards or underground utilities, or injuries to persons who enter the work area without the company's authorization, except to the extent caused by the company's negligence or willful misconduct.

12. Insurance and Site Safety

The company maintains insurance coverage as required by California law. Work areas may contain hazards, and the customer agrees to keep family members, guests, and pets away from active work areas. The company may place temporary barriers or signage, which shall not be removed by the customer until the company advises it is safe to do so.

13. Photographs and Marketing

The company may photograph completed work for portfolio and marketing purposes, provided that no personal information or street address of the customer is disclosed without consent. The customer may opt out by notifying the company in writing.

14. Dispute Resolution

The parties agree to attempt in good faith to resolve any dispute arising from or relating to these Terms or the services through informal negotiation. The customer shall provide written notice describing the dispute, and the parties shall confer within thirty (30) days. If the dispute is not resolved, the parties agree to submit it to non-binding mediation in Los Angeles County, California, with mediation costs shared equally, before initiating litigation, except that either party may pursue claims within the jurisdictional limit of small claims court without first mediating. If mediation is unsuccessful, either party may pursue available remedies in a court of competent jurisdiction. The prevailing party in any action to enforce these Terms shall be entitled to recover reasonable attorney fees and costs, to the extent permitted by law. Nothing herein limits the customer's right to file a complaint with the Contractors State License Board.

15. Governing Law and Venue

These Terms and any project agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflict of law principles. Any legal action arising from these Terms or the services shall be brought exclusively in the state courts located in Los Angeles County, California, and the parties consent to the personal jurisdiction of such courts.

16. General Provisions

These Terms, together with any written estimate, contract, and signed change orders, constitute the entire agreement between the parties regarding the services and supersede all prior oral or written understandings. If any provision is found unenforceable, the remaining provisions shall remain in full force and effect. The failure of the company to enforce any provision shall not constitute a waiver. The customer may not assign any rights under these Terms without the company's written consent. The company may update these Terms from time to time; the version in effect at the time a project contract is signed shall govern that project. Notices shall be in writing and delivered by email, mail, or hand delivery to the addresses provided by the parties.

If you have questions regarding these Terms of Service, wish to request an estimate, submit a warranty claim, provide a cancellation notice, or raise a concern about our services, please contact Temple City Concrete Contractors by email at sales@templecityconcretecontractors.com. We serve Temple City, California and surrounding communities, and we will make reasonable efforts to respond to all inquiries promptly, typically within two (2) business days.